72-Hour Standard Delivery

72-Hour MEP Takeoffs &
Cost Estimates

Professional HVAC, Plumbing, and Electrical estimates delivered on a defined timeline — with an optional 48-hour rush for tight bid deadlines.

Fast turnaround • 48-hour rush available

House plan project .Technical drawing background. Engineering design .

72 Hours

Standard

How It Works

Fast, professional workflow from submission to delivery in 72 hours

1

Submit Project & Complete Payment

Upload drawings and complete secure payment to begin

2

Priority Review & Scope Confirmation

Your project enters priority review queue immediately

3

MEP Takeoff & Estimating (72 Hours)

Our team prepares detailed trade-specific takeoffs and estimates

4

Receive Bid-Ready Deliverables

Download your complete estimate package and bid with confidence

Trades We Cover

Comprehensive MEP estimating services across all major mechanical, electrical, and plumbing trades

HVAC

  • Equipment and system takeoffs
  • Ductwork, piping, accessories
  • Budget-level and bid-ready estimates

Plumbing

  • Domestic water, sanitary, gas
  • Fixture and piping quantities
  • Trade-specific estimating

Electrical

  • Power and lighting takeoffs
  • Device counts and systems
  • Electrical scope estimating

Built for Real Construction Projects

Professional estimating service designed for contractors and developers

Designed for Contractors

Paid Professional Service

Secure Document Handling

Clear Scope Separation

Reliable Results

Two professionals discussing project details at a workstation in a factory environment

Built for Real Bid Deadlines

Fast, professional MEP estimating when timing matters most

Workplace of architect. Rolls of blueprints.
72-Hour Standard

72-Hour Standard Turnaround

Defined delivery timeline so you can plan your bid schedule with confidence

48-Hour Rush Option Available

For tight bid deadlines, request expedited delivery on qualifying projects

Paid, Professional Estimating Service

No "we'll get back to you" — clear pricing and defined delivery from day one

Trade-Specific Takeoffs (HVAC, Plumbing, Electrical)

Organized by system with clear scope separation for accurate bidding

Clear Scope, Clear Pricing, Clear Delivery

Know exactly what you're getting and when you'll receive it

This service is commonly used for:

Pre-Bid Estimating

Accurate estimates before submitting proposals

Budget Validation

Verify project costs against budget targets

Subcontractor Pricing

Support accurate subcontractor quotes

Project Feasibility

Assess viability before commitment

MEP Takeoff & Estimating Pricing

Project-based pricing with built-in savings for bundled trades

72-Hour Standard

Single-Trade Estimate

$499 per trade

HVAC or Plumbing or Electrical

  • Quantity takeoff
  • Cost estimate
  • One drawing set
Submit Project
MOST POPULAR • 72-HR STANDARD

Two-Trade MEP Bundle

$899 total

Any two MEP trades

  • Any two MEP trades
  • Coordinated takeoffs
  • Trade-specific estimates
  • Bundle savings included
Start Your Estimate
BEST VALUE • 48-HR RUSH AVAILABLE

Full MEP Bundle

$1,249 total

HVAC + Plumbing + Electrical

  • HVAC + Plumbing + Electrical
  • Fully coordinated MEP takeoffs
  • Trade-separated estimates
  • Best overall value
Submit Project for Review

Pricing Note

Final pricing may vary based on project size, drawing quality, and complexity. Large or highly detailed projects may require custom pricing.

What You Receive With Every Estimate

Professional, trade-specific estimating deliverables designed to support real construction bids and budgets

Detailed Quantity Takeoffs

  • Trade-specific quantities based on submitted drawings
  • Organized by system and scope
  • Clear counts for equipment, piping, ductwork, devices, and fixtures

Cost Estimate Summary

  • Budget-level or bid-ready cost estimates
  • Line-item clarity by trade
  • Designed to support internal budgeting or subcontractor pricing

Trade-Separated Scope

  • HVAC, Plumbing, and Electrical scopes clearly separated
  • Eliminates overlap and confusion
  • Ideal for GC coordination and subcontractor review

Professional File Formats

  • PDF deliverables (clean, shareable)
  • Excel-style summary (when applicable)
  • Organized for easy review and markup

Defined Turnaround

  • Standard turnaround communicated at checkout
  • Expedited options available for qualifying projects
  • Clear expectations before work begins

Secure Project Handling

Your project documents are:

  • Submitted through a secure portal
  • Reviewed by experienced estimating professionals
  • Kept confidential and project-specific

Important Notes

  • Deliverables are based solely on the drawings and documents submitted
  • Estimates are intended for bidding and budgeting purposes
  • Revisions outside the original scope may require additional fees

Ready to Receive a Bid-Ready MEP Estimate?

Frequently Asked Questions

Everything you need to know about our MEP estimating services

Have a Project Ready for Estimating?

Ready to Get an Accurate
MEP Estimate?

Professional takeoffs and cost estimates prepared by our team for your next construction project

Professional Service

Expert estimators

Secure Platform

Protected documents

Accurate Estimates

Bid with confidence